Stancold’s passive fire protection works continue in Wiltshire throughout the start of 2020, as we work with one of the UK’s leading construction contractors.
Our LPS 1500 approved installation team used the Eurobond Firemaster composite panel system of 100mm thickness to construct a sub-dividing partition wall, achieving a one-hour fire rating. Firestopping and fire boarding were required to seal openings and protect the existing steelwork to also maintain the rating to one hour.
Whilst this is a smaller project within the overall works across the barracks, Stancold were able to demonstrate efficiency and flexibility in completing the passive fire protection to a high standard.
We look forward to further work within the military sector.
For more information on composite panel systems suitable for your environment, don’t hesitate to get in touch with our industrial partitions specialist, Shaun Jones, on 07821 152 663 or through our enquiry form here.