Stancold are looking forward to starting work in Berkhamsted this month for a valued client of over 10 years.
The project will see the complete fit-out of a new production facility, as the company relocate their manufacturing processes from their existing base in North London. Stancold’s strong working relationship with the client over the last decade will be paired with our consistent valuable design, technical and project management knowledge.
The Stancold installation team will be using high-quality Kingspan Quadcore panelling with food-safe finishes to create preparation, production, processing and packaging areas alongside cold storage facilities and personnel space. Every aspect of the project has been designed to suit the client’s specific operational requirements.
It will be a pleasure to work with our client again during their relocation venture and enable them to be up and running in the new space within 10 weeks.
If you would like to find out more about our work in the food and drink sector or how we can assist in the expansion, relocation or refurbishment of your food production facility, please give us a call on 0117 316 7000 or send us a message using our contact form.