Triple Compartment Cleanroom

BSRIA

Background:

CREST were approached by BSRIA, a construction research and testing organisation, who were opening a new facility and required a cleanroom design and build solution.

Process:

Due to the large cleanroom design and build scope, the team worked closely with the client to create a seamless construction plan in order to meet expectations on time management.

CREST’s highly skilled team installed numerous doors to accommodate BSRIA’s needs. This included four-hinged clamp frame personnel doors, a hinged emergency exit door, and a heavy-duty sliding chiller door. Each door would enable ease of access for personnel and large pieces of equipment, whilst maintaining smooth operations throughout the facility.

Additionally, seven single vision panels were installed to allow for visibility from outside the cleanroom in order for safe observation without disrupting the controlled environment, helping maintain sterility and containment. This would also improve communication and safety by providing clear visibility between spaces, reducing unnecessary entry and contamination risks.

Project Delivery:

CREST’s unrivalled knowledge left the client satisfied with the outcome and ready for them to begin their accredited testing in each of the installed rooms.

We were all hugely impressed with the job, everything was done very well. If we ever have need of such work again I would definitely use you.

June Davis, BSRIA
LocationPreston
Building useConstruction Research and Testing Facility
Panel CoreQuadCore
Panel SupplierKingspan
Panel Thickness100mm
Panel FacingLaminated Foodafe Finish, 120 Micron Tthick
Panel Requirements320m²
ServicesOn-Site Flexibility
Detailed Site Survey
Cleanroom Expertise
Detailed Construction Plan