Semi-Flush Cleanroom

Snazaroo

Background

Due to continuous growth in product ranges and increase of global demand, our customer required a semi-flush cleanroom for the mixing of fine powder pigments and cosmetic ingredients to produce their 100% skin friendly paraben and fragrance-free paints.

Requirement

Our scope of works consisted of a semi-flush ISO 8 cleanroom installation accommodating machinery and air vents, complete with a built-in atrium functioning as a high care changing area.

Solution

Stancold engineered a solution with a cleanroom panel system suitable for the application and achieving considerable savings for the customer.

Stancold specified a panel system capable of supporting 4 apertures for filters, supplied 3 vision panels, 3 transparent swing doors for better light conditions and security reasons.

Contact Mark Kendrick for cleanroom advice

You are very professional. We are very pleased with the installation and would recommend you to anyone.

Adrian Ryan, Snazaroo
ProjectSemi Flush Cleanroom Installation
LocationMinehead, Somerset
Building UseFacepaint Production
Panel CorePIR
Panel SupplierKingspan
Panel Thickness50mm, 80mm
Panel FacingWhite Cleanable uPVC Hygienic Finish
Panel Requirements70m²
Doors/Windows15mm Swing Doors, 3 Vision Panels