Background 

After recently renovating the large barn, our client required a fire-rated partition in order to house a second tenant.

Process

Following initial research into jumbo stud partitions, the client made an online enquiry to Stancold for the best alternative solution.

The client required the most cost-effective product to suit their budget and needed a quick turnaround for their new tenant’s move-in date.

Solution

Stancold mobilised quickly and in just 20 days from the order being placed, the team completed the installation of a sub-dividing industrial partition with one-hour fire rating.

This was completed using Eurobond 100mm Mineral Fibre panels, measuring approximately 6m x 1.2m, and fire stopping products to ensure the fire integrity of the installation was achieved.

As Stancold’s firewall projects do not require wet trades, the installation itself was handed over in just 6 days and completed within the client’s tight timescale.

Watch the installation video here.

Contact Shaun Jones with your enquiry

We are very pleased with the work undertaken by Stancold.

Estate Owner
LocationOxfordshire
Building UseCommercial Property
Panel CoreMineral Fibre
Panel SupplierEurobond
Panel Thickness100mm
Panel Requirements191m²
ServicesProject Specific Design Advice
CAD Design
Site Surveys
Project Management