Multi-Vaccine Production Facility

Speciality Vaccine Manufacturer

The Brief

Equans appointed Stancold to deliver the cleanroom fit-out for a new multi-vaccine production facility in Livingston, Scotland. The specification covered EU GMP Grade B-D positive and negative pressure cleanrooms, CL3 laboratories and controlled not classified (CNC) pharmaceutical areas. Fire-rated and security-rated requirements applied across key zones and everything had to be delivered within a fast-track programme with multiple trades working in parallel.

Our Approach

Our design and project management team worked as an extension of Equans’ own. We independently recommended the right system for each application and developed bespoke solutions wherever the programme pressure demanded it.

We built a detailed construction schedule aligned to the wider contractor programme and placed a dedicated on-site supervisor to manage daily activity. This gave Equans a single point of coordination and kept momentum across every trade interface.

Delivery in Action

The design compromised two mirrored manufacturing suites either side of a central fire-rated corridor. Achieving a seamless finish meant integrating three colour-matched panel systems (Puracore, Kingspan Versatile and Euroclad Firemaster) into one consistent cleanroom envelope. The internal faces of the external walls were lined with FR60 fire-rated composite panels in line with the agreed fire safety strategy. An SR4 security-rated lining package from MSS was installed on a return visit to protect sensitive areas.

The main cleanroom fabric was completed in 14 weeks, with installation phased around follow-on trades. Our team coordinated directly with the ductwork contractor, sequencing ceilings ahead of walls. We also formed low-level extracts within our double-wall system to conceal all services, with reduced rework and protected the programme.

The result was a technically demanding, time-critical package delivered on schedule for the main contractor and end user, with no compromise on quality or safety.

You have done a fantastic job in tough circumstances. I look forward to working closely with you in the near future.

Alan Miller, Regional Director of Equans
Location Livingston
Building Use Speciality Vaccine Production
Panel System Puracore; Euroclad; MSS; Kingspan
Panel Core Aluminium Honeycomb; Mineral Fibre; PIR
Panel Thickness 17.5mm; 50mm; 100mm; 125mm
Panel Requirements 8,350m²
Specialist Expertise Fast-Track Cleanroom Delivery
Multi-Trade Programme Coordination
Fire & Security-Rated Linings