ISO 8 Cleanroom Build

Snazaroo

Background:

Due to continuous growth in product ranges and increase of global demand, our customer required an ISO 8 cleanroom for the mixing of fine powder pigments and cosmetic ingredients to produce their 100% skin friendly paraben and fragrance-free paints.

Process:

Our scope of works consisted of the design and build of a semi-flush ISO 8 cleanroom, accommodating machinery and air vents supplied by their preferred M&E contractor, complete with a built-in atrium functioning as a high care changing area.

Project Delivery:

CREST successfully delivered a complete cleanroom envelope that was value-engineered to suit the client’s requirements. This included 4 filter units, 3 vision panels and transparent personnel doors for better light conditions and security reasons.

You are very professional. We are very pleased with the installation and would recommend you to anyone.

Adrian Ryan, Snazaroo
LocationSomerset
Building UseFace Paint Production
Panel CoreQuadCore
Panel SupplierKingspan
Panel Thickness50mm, 80mm
Panel Requirements70m²
ServicesValue Engineering
Expert Specification Support
Semi-Flush Panel System
Flexible Design Considerations