ISO 8 Cleanroom for Electrical Components Manufacturing, Dundee

Electrical Manufacturing

Background 

Stancold worked with cleanroom contractor, Monmouth Scientific, in Dundee to successfully construct a new cleanroom for an electrical components manufacturer.

Process

Stancold’s strong expertise in the design and build of the cleanroom envelope were fully utilised throughout this project, where three different panel systems were integrated to create a new ISO 8 cleanroom and glazed office partitioning.

Our team were able to offer valuable advice on each system and discuss how it would work within the finished facility, all confirmed with a site survey to visualise the agreed design and understand site conditions.

Solution

The project encompasses approximately 523m² of insulated panelling, with the ISO 8 cleanroom constructed using the semi-flush Kingspan Versatile system, of 100mm thickness.

The accompanying office space utilises a Puracore glazed wall system, which includes 50mm Aluminium Honeycomb panels with frosted double-glazed flush windows and a fully glazed door. All ceilings across the two areas employ the Kingspan Versatile system. Mineral Fibre panelling was also installed as part of this project’s specification.

Our installation team’s panel construction expertise was fully exercised throughout, as the build was carried out while the facility remained operational, thus not impacting on the end user’s production capabilities.

Contact Mark Kendrick for cleanroom advice

Utilising three panel systems demonstrated the team's excellent construction experience

Lee Duffield, Project Manager
LocationDundee
Building UseElectrical Manufacture
Panel CoreQuadcore; Aluminium Honeycomb; Mineral Fibre
Panel SupplierKingspan; Puracore; Eurobond
Panel Thickness50mm; 100mm; 220mm
Panel Requirements523m²
ServicesDetailed Design Advice
Full Site Surveys
Expert Product Knowledge