Food-Safe Fit-Out in Production Extension for National Food Manufacturer, Slough

National Food Manufacturer

The Brief

Following a competitive tender process, Stancold won the work to complete the entire internal food-safe fit-out for a new food production area extension spanning two floors, undertaken by national contractor, Walker Construction.

Our Approach

The end user, a household name in food manufacturing, specified non-combustibility as a key factor within the construction. To meet their requirements, Stancold were able to offer white hygienic panelling with a Mineral Fibre core and worked with Walker Construction and the end user to accommodate changing design specifications before starting on-site.

Delivery in Action

Stancold installed a comprehensive system of mineral fibre core panelling with a hygienic finish, to form a number of new areas within the vast production warehouse space. This included goods-in areas, pallet stores, stairwell enclosures between floors, hygienic corridors and plant rooms.

We were also responsible for the installation of all single and double fire exit doors, as well as 60-minute fire-rated doors where required; approximately 40 doors in total.

The team took care of the intricate construction details around the existing steelwork, carefully matching up panel joints for an aesthetically pleasing finish throughout. Our attention to detail and flexibility on-site, working with and around other contractors, were key elements in ensuring that the build was a success.

A large-scale fit-out project delivered exceptionally by the Stancold team

James Hoy, Contracts Manager
Location Slough
Building Use Food Manufacture
Panel Core Mineral Fibre
Panel Supplier Eurobond
Services Full Site Surveys
Project Management
Technical Expertise