Food-Safe Fit-Out in Production Extension for National Food Manufacturer, Slough

National Food Manufacturer

Background 

Following a competitive tender process, Stancold won the work to complete the entire internal food-safe fit-out for a new food production area extension spanning two floors, undertaken by national contractor, Walker Construction.

Process

The end user, a household name in food manufacturing, specified non-combustibility as a key factor within the construction. To meet their requirements, Stancold were able to offer white food-safe panelling with a Mineral Fibre core and worked with Walker Construction and the end user to accommodate changing design specifications before starting on-site.

Project Delivery

Stancold installed over 4200m² of Mineral Fibre core panelling with a food-safe finish, to form several new areas within the vast production warehouse space. This included goods-in areas, pallet stores, stairwell enclosures between floors, hygienic corridors and plant rooms.

Stancold were also responsible for the installation of all single and double fire exit doors, as well as 60-minute fire-rated doors where required; approximately 40 in total.

The team took care of the intricate construction details around the existing steelwork, carefully matching up panel joints for an aesthetically pleasing finish throughout.

Our attention to detail and flexibility on site, working with and around other contractors, were key elements in ensuring that the food production extension build was a success.

Andy Connell

A large-scale fit-out project delivered exceptionally by the Stancold team

James Hoy, Contracts Manager
LocationSlough
Building UseFood Manufacture
Panel CoreMineral Fibre
Panel SupplierEurobond
Panel Thickness100mm; 150mm
Panel Requirements4282m²
ServicesFull Site Surveys
Project Management
Technical Expertise
Quality-Assured Installation