Food Production Facility – Internal Fit-Out & Purpose-Built Extension

Speciality Food Manufacturer

Background

Stancold were involved in early-stage negotiations with a growing speciality food wholesaler, who were looking to expand and relocate their manufacturing facility within Birmingham.

Experienced project management contractor, Pentadel, took on the full turnkey package to transform and extend a tired existing building into a fit-for-purpose food manufacturing facility.

Process

Stancold were appointed to undertake the internal food-safe fit-out, alongside the internal and external cladding of a purpose-built extension, suited to product packaging and dispatch.

Our team worked collaboratively on the design and specification of this project to ensure that the end user’s requirements were met. Transferring specialist panel-build knowledge and skills into the external extension works allowed us to confidently add this element to our responsibilities.

The full specification included over 10 different areas, such as main production, a blast chiller, dry store and soy room.

Project Delivery

As part of a 9-month phased construction, which included coordinating with other contractors on the busy site, Stancold installed over 5500m² of food-safe insulated panels internally to form areas as per the end user’s specification, alongside a 60-minute sub-dividing firewall between the building and its new extension, another part of Stancold’s scope to meet fire safety building regulations.

The extension construction included all cladding, using goosewing grey trapezoidal panels from Kingspan’s roof system, and door canopy. These works also encompassed a one-hour fire-rated boundary wall, utilising a RockSpan composite core. With tight access to consider, panels were craned from a bank to the rear of the building, alongside narrow plant used throughout.

Internally, the fit-out incorporated bespoke window details to accommodate the building’s existing roof lights, as well as specialist flush windows, allowing free viewing into the main production area. The team constructed a bulkhead to neatly conceal air handling equipment and all existing steelwork was encased to maintain food safety excellence.

This was a large project that required timely planning, coordination and construction at every stage, where our team thrived in demonstrating such qualities.

You can take a tour around the facility here.

Contact Patrick Ball

A project that demonstrated our commitment to the food industry

Sam Glover, Contracts Manager
LocationBirmingham
Building UseSpeciality Food Production
Panel CoreQuadCore; Mineral Fibre, RockSpan
Panel Thickness80mm; 100mm; 120mm; 150mm; 175mm
Panel Requirements5648m²
ServicesExternal Cladding
Multi-Discipline Construction
Project Design & Co-ordination