Fire-Rated Staircase Enclosures For Fulfilment Centre

Industrial Storage Specialist

Background

Stancold were delighted to work again with our client who is a specialist in industrial storage solutions, following the success of our recent collaboration on a fashion retail distribution warehouse. Building on that trusted relationship, we were appointed to deliver fire-rated staircase enclosures as part of a new e-commerce fulfilment centre in Northampton.

Process

A four-storey mezzanine structure was being installed within the fulfilment centre, requiring four fire-rated staircase enclosures as part of the building’s fire safety strategy.

The main project challenges included:

  • Coordinating a phased installation programme alongside the mezzanine build, ensuring both elements progressed without delay
  • Working in limited access environments across multiple levels
  • Executing a multi-phase approach that allowed mezzanine floor construction to proceed between panel installation and door integration

Project Delivery

Our experience in multi-level mezzanine construction meant we understood the logistical complexities from the outset. A collaborative programme of works was developed to ensure that the build of each element was coordinated seamlessly.

Stancold’s LPS 1208 accredited installation team utilised Euroclad Firemaster panels at 100mm thickness, as it was able to achieve the specified 60-minute fire-rating, installing directly to the mezzanine structure.

The works took place over several phases: composite panels were erected horizontally to enclose the new stairwells before floors were constructed by our client. In the final stage, our team returned to integrate approximately 20 one-hour fire-rated personnel doors, completing the fully compliant enclosure system. The entire project spanned over 950m² of panels.

Our team’s ability to adapt within limited access working environments enabled Stancold to deliver this substantial, multi-phase project successfully and continue building on our existing working relationship with the client.

Teamwork and co-ordination ensured our success

Rob White, Stancold Contracts Manager
LocationNorthampton
Building UseE-Commerce Fulfilment
Panel CoreMineral Fibre
Panel SupplierEuroclad
Panel Thickness100mm
Panel Requirements965m²
ServicesExpert Product Knowledge
LPS Approved Installation
Phased Construction