Background:
Following the success of a prior project, CREST were contacted directly to help a pre-existing client design and build a coldstore, freezer, and ambient room for their second warehouse following a relocation.
Process:
The client required a fast turnaround, prompting CREST’s team to conduct a comprehensive site survey within just four days of the initial enquiry.
The scope of the project included the design of a bespoke reinforced freezer floor. Due to the nature of our client’s onsite operations, the traditional concrete flooring wouldn’t cope with the pressure from the excessive weight of the cargo pallets.
Our team’s strong communication and commitment to meeting client needs enabled us to deliver three high-quality designs, giving the client clear options to match their requirements.
Project Delivery:
Despite the tight schedule, the team were fully prepared to begin installation on-site within six weeks of the initial enquiry.
Due to the nature of the client’s work, the challenge of working in a live everchanging environment was presented. However, with the team’s extensive installation experience, the planning and delivery service ran smoothly.
Along with the bespoke freezer flooring, as part of the project scope we provided our N+1 refrigeration package that conducts constant temperature-mapping.
Our team worked incredibly hard in a live working environment.