BREEAM pass fire rated partitions for commercial distribution units

Colmore Tang Construction

Background 

Following a successful tender bid, Stancold was appointed by the principle contractor to install fire-rated dividing walls between office and warehouse spaces across two new distribution units at Pineham Park. As a trusted supplier with a proven track record, Stancold was specifically selected to contribute to the development’s sustainability ambitions.

Process

Stancold worked closely with the principle contractor on project programming, ensuring our installation schedule was fully coordinated with other contractors on site. Operating across a live construction environment, our team planned two dedicated site visits to each unit, minimising disruption to the wider programme while maintaining delivery timelines.

The main project challenges included:

  • Coordinating installation across two units on a live, multi-contractor site without disrupting wider construction activities
  • Achieving a 4-hour fire rating for 815m² of partition walls while meeting stringent sustainability requirements for BREEAM assessment

Our team specified Euroclad Mineral Fibre 150mm panels for this project due to their outstanding fire performance and sustainable material credentials making them a strong option to help the client pass their BREEAM assessment.

Project Delivery

Our LPS 1500 approved installation team completed the full 815m² of fire-rated partitioning across both units within 2 weeks, constructing a personnel office on a raised platform within the warehouse space. Panels were installed vertically to achieve the required fire rating, with comprehensive fire-stopping products applied throughout to ensure maximum fire integrity.

We were also pleased to hear that our decision to install Euroclad’s mineral fibre system successfully led to our client achieving a ‘very good’ BREEAM assessment rating. The principle contractor’s decision to work with trusted suppliers like Stancold proved instrumental in securing this status, demonstrating how the right specification choices can support both fire safety compliance and environmental goals.

We're very pleased to have worked on this BREEAM accredited project.

James Cowmeadow, Project Manager, Stancold
LocationNorthamptonshire
Building UseDistribution Centres
Panel CoreMineral Fibre
Panel SupplierEuroclad
Panel Thickness150mm
Panel Requirements815m²
ServicesProject Specific Design Advice
Turnkey Firewall Package
BREEAM Experience