10,000m² Production & Storage Facility For Food-To-Go Manufacturer, London

Food-To-Go Manufacturer

Background 

Due to continued business growth, this food-to-go manufacturer needed to expand their food production and storage facility.

Process

For this complex scheme, we had to consider the different temperatures for chillers, freezers and packing facilities along with fire-rated areas within the production facility. The plan included a range of facilities; ingredient chillers, product preparation rooms, temperature-controlled packing areas, low-temperature storage and marshalling areas, alongside the installation of 58 various doors.

Project Delivery

To suit the requirements of each room, a range of different panel thicknesses were used across the project, including a 175mm firewall. Due to its large-scale nature, a project re-design was required during installation to include adaptations to work around steel walkways in the ceiling. The complexity of this project displayed the Stancold team’s technical capabilities and ability to meet our clients’ specific requirements.

Take a tour of the new facility with our video here.

Andy Connell

A large-scale complex project delivered exceptionally by the team

Lee Duffield, Project Manager, Stancold
LocationNorth London
Building UseFood Manufacturer
Panel CoreIPN Quadcore
Panel SupplierKingspan
Panel Thickness1200mm, 50mm, 125mm, 200mm
Panel Requirements10,000m²
ServicesFree Consultation
Development of Bespoke CAD Details
Project Management
Maintenance Advice