< Back to the Blog

Fire-Rated Partitions: Your Questions Answered

As we approach the end of the year, projects are wrapping up and many businesses are planning ahead. One trend we’ve noticed at Stancold is an increase in enquiries for fire-rated partitions and industrial walls. Throughout every stage of the project lifecycle, we always strive to provide relevant guidance and expert advice, ensuring clients feel supported from initial concept through to completion.

 

To shed light on the most common questions we’ve received, we sat down with Shaun, our Senior Business Development Manager, for a quick Q&A to talk through what clients want to know so we can help them find the right solution. Here’s what he had to say:

 

Let’s start with the basics, what is a firewall?

In short, a firewall is a partition designed to stop fire from spreading between two areas for a set amount of time, and the amount of time is based on its fire rating.

And does Stancold advise on the fire rating I’ll need for a project?

Not quite. We can guide you on the systems available, but the specific fire rating usually comes from Building Control or your insurer. Once you know what rating is required, we’ll make sure your installation meets those standards.

What information do you need to provide a quote?

We’ll need the wall’s dimensions and details about the two areas it will separate. Knowing which space needs protection from the fire helps us design the right solution.

Will the firewall protect both sides?

It can, yes, but it depends on how we install it. We’ll talk through your requirements and make sure the system works for your set up.

Will I need structural steel support?

If the wall is taller than the panels then yes, you will need structural support. We’ll install the panels horizontally with steel supports for you.

Are Stancold’s systems compliant?

Absolutely. Everything we install is LPS compliant and certified to EN standards.

Can Stancold just supply the panels?

We can’t offer supply-only panels due to certification requirements. We manage the full installation to make sure everything is safe and compliant.

Are the panels FM-approved?

Yes, we source and install FM-approved composite panel systems.

What size projects do you usually work on?

We work on all sorts of fire-rated partitioning projects, but we’re most competitive on installations over 50 square meters.

Do you offer site surveys?

We do offer site surveys, and we strongly recommend one! Seeing your site in person helps us plan the most accurate, bespoke solution.

Do you do repairs?

No, we don’t offer repairs on existing firewalls.

Can you install a 4-hour fire-rated ceiling?

Unfortunately, no. Those panels are too heavy for a ceiling installation. But we can build a 4-hour fire-rated enclosure if the panels go right up to the existing roof.

How long will it take?

Our systems are made to order, so lead times are usually 6-8 weeks from when the order is placed.

 

Ready to start?

If you’re planning a fire-rated partitioning project or have any additional questions, get in touch with Shaun today:

Still have burning questions that can’t wait? Check out our FAQs on our service pages.