Essential Considerations Before Starting Your Industrial Firewall Project

When planning an industrial firewall or fire-rated partition wall, understanding the key technical and logistical requirements upfront can save significant time and money. Before you request a quote, there are several critical factors that will influence not only the price but also the feasibility and timeline of your project.

This guide walks you through the essential considerations that will help you get an accurate quote and outlines what you can expect from the process from specification through to completion.

Fire Rating Requirements:

‘What fire rating do you need?’

This is perhaps the most fundamental question. Fire ratings (FR) are typically measured in time periods such as 30 minutes, 60 minutes, but you will also see them referred to as FR30, FR60 and so on. Fire ratings indicate how long the wall must withstand fire and prevent its spread.

The required fire rating typically depends on:

  • Building regulations
  • Insurance requirements
  • Business requirements
  • The risk level of materials or processes in your facility
  • Industry-specific standards

If you’re unsure what fire rating you need, we recommend going back and confirming with your insurer, architect, or whoever advised you’ll need a firewall in the first instance to ensure you get an accurate quote.

Understanding LPCB and EN Certification Standards

When you come to us for a firewall project, you’ve typically already been guided by professionals who understand fire safety requirements. Most commonly, our clients are referred to us by insurers (who often specify LPCB standards to ensure comprehensive coverage) or by architects working on their building design. Understanding the certification standards they recommend is crucial for getting the right specification.

Different certification bodies test and certify fire-rated walls. The two most common are:

LPCB (Loss Prevention Certification Board): Typically recommended by insurers as it provides them with assurance that the wall meets rigorous fire protection standards and reduces their risk exposure. LPCB standards typically align with EN (European Norm) standards but may have additional requirements. If your insurer has specified LPCB, this will be a key requirement for your project.

EN Standards: European standards for fire resistance testing. These define how walls are tested and what performance criteria they must meet.

Key difference: The maximum panel spans (distances between supports) can differ between LPCB and EN certifications for the same wall system. This affects the structural design and may require additional steelwork depending on your layout.

 What Area Needs Protection?

Most firewall specialists will be able to offer one and two-sided protection so it’s useful to know and define your protected zone before approaching a supplier.

A one-sided wall contains fire spread in a single direction, while a two-sided wall ensures both spaces either side of the partition remain protected, regardless of where a fire breaks out. The right specification will depend entirely on the layout of your facility and the nature of the spaces being divided.

Understanding your protected zone helps our design team to customise a solution tailored to your specific needs and insurance requirements and ensures we provide you with an accurate quote for your project.

Understanding Project Timelines

When a fire rated specialist works on a project, the design team will create a bespoke solution to meet a client’s exact project requirements, because of this, all composite fire-rated panels are made to measure.

Manufacturers do not stock pre-made panels so it’s good to know how this will impact your project timeline. Take a look at a typical Stancold timeline breakdown below:

Typical timeline breakdown:

  • Quote and design process: Typically 2-3 weeks. Initial survey, specification development, and detailed quotation
  • Design approval and finalisation: Technical drawings, calculations, amendments and then a final approval from yourself.
  • Panel manufacturing: Typically 6-8 weeks from order placement (panels are cut and finished to your exact specifications)
  • Delivery and installation: Scheduled according to project requirements. This can take longer if additional secondary structural steel is required. Our dedicated team will guide you through the timeline to ensure it fits around you and other contractors on site.

Getting Started: Preparing for Your Quote

To receive an accurate and comprehensive quote, we’d ask you to gather as much of the following information:

  • Required fire rating and any relevant certifications (LPCB, EN standards)
  • Wall dimensions (height, length) and protected zone configuration
  • Number and size of door openings required
  • Site conditions (live or non-live, access constraints)
  • Existing obstacles (racking, equipment, etc.)
  • Project timeline and any critical deadlines
  • Site plans or photographs if available (our team can also organise a site visit later)

Alternatively, if you don’t have all the specific project information at this stage, you can use our Quick Quote Calculator to get an estimated budget for your project.